Wednesday, June 30, 2010

Venus Mobile Explorer Concept

Note: Summer is the time for my field work, so updates to this blog will be less frequent for the next two months.


In the last blog entry, I discussed a mission concept being investigated by the Decadal Survey to place a lander on the Venus highlands (the tessera) called VITaL.  This entry explores a second mission concept, the Venus Mobile Explorer (VME).  In many ways VME is similar to the Venus tessera lander -- they both target the highlands and they both carry nearly identical compliments of instruments.  While VITaLwould land at a single site, VME would land at one site, inflate a "balloon", float in the wind a few kilometers above the surface, and then land at a second site.  This would allow imaging of a traverse of 8-16 km before settling at the second site.  The imaging traverse and landing at two sites would help determine the diversity of the highlands, which may be remnants of ancient crust.  Like the ViTAL mission, the VME mission was recently described in a paper presented at the 7th International Planetary Probe Workshop.


Since the instruments for the two missions are nearly identical (please see the VITaLdescription), I'll concentrate on the differences between the two missions in this entry.  I used the term "balloon" in quotes above because "bellows" would be a more appropriate term.  In the harsh conditions at and near the surface of Venus, traditional balloon materials cannot be used.  Instead, VME would inflate a bellows system with helium to create lift and allow the lander to lift off and drift for approximately 4 hours before the second landing.  At either a preset time or when internal temperatures within the probe rise above a preset limit, the bellows are discarded.  The bellows cannot be deflated and then reused a second time because of plastic deformation of the metal in them during their first use.


The goal of the 25 Decadal Survey mission studies  is to (1) scope out the concepts since many were ill defined at the start of the Decadal process, a problem that caused substantial cost under estimation in both the last astronomy and planetary Decadal Surveys; (2) determine the technological maturity of the concepts; and (3) provide cost estimates of the leading concept missions.  The Decadal Survey members will eventually select a small subset of the 25 missions that fit within the budget, are (or can be in the next decade) technically mature, and that are most likely to provide the greatest advance in our understanding of the planets and their histories.  


In keeping with the goals of assessing mission concepts, the authors of the VME paper list several issues with this concept:


1) The lander would need to survive the harsh conditions of the surface and near-surface for almost 5 hours (including time to transmit data up to the telecommunications relay), compared to the two hours for the VITaLconcept and three hours for the proposed SAGE Venus lander New Frontiers mission proposal.  This leads to challenges in ensuring the interior of the lander remains cool enough to operate, increasing the cost of the mission.


2) The design of the bellows, the helium tank, and other mechanisms will be challenging and these elements require additional technological maturity before they can be used, adding to mission cost and risk.


3) The estimated cost of the mission without launch vehicle is $1.7B and with launch vehicle is $1.9B.  [Editorial note: It often hard to compare mission proposal costs since details of what are included and excluded from costs often aren’t detailed.  The cost of the SAGE lander is presumably within the $650M cap for the spacecraft portion of New Frontiers missions.  However, the fully burdened cost of New Frontiers missions is approximately $1.2B, which includes the cost of the launcher and other overheads for running the New Frontiers program.]


Editorial Thoughts: Unless Venus exploration is given a high priority in the Decadal Survey process, the $1.7B price tag for this mission plus its technical immaturity would seem to make its selection unlikely.  The authors of the VME study point out that they believe that "the bellows mobility concept is likely one of the lower cost ways to visit two different landing sites, though it has a higher risk versus multiple heritage [e.g., multiple SAGE or VITaLsingle location landers]."  For the same launch mass and volume, two to three heritage landers could be delivered to Venus, although the authors do not provide a cost estimate.  I have read that additional spacecraft of identical design cost ~50-60% the cost of the first spacecraft.  So, if the SAGE spacecraft is ~$650M, then a second copy might be in the range of $325-375M.  This back of the envelope analysis suggests that two to three heritage landers could be flown within the cost envelope of VME with lower technical risk.


On another topic, the VME paper makes clear why current Venus lander concepts are proposing to use laser-based remote sensing of the surface instead of direct analysis.  To measure the surface material with any finesse, a sample needs to be brought into the lander where the instruments can be kept cool.  The sampling mechanism for bringing in the surface material would weigh ~4 kg and the analysis would require a minimum of 2 hours.  Sampling multiple locations with a laser (for illuminating the surface for Raman spectroscopy and vaporizing it for induced spectroscopy would require ~15 minutes.  Reducing surface measurement time by an hour and 45 minutes should substantially reduce mission risk.


Closing note: The VME paper provides one of the most succinct summaries of the goals for Venus landers that I've seen.  Measurements of the atmospheric composition are equally important as measurements of surface composition to meeting the full suite of goals.  I'm quoting the entire list here:


1) determine whether Venus has a secondary atmosphere resulting from late bombardment and the introduction of significant outer-solar system materials, including volatiles, 
2) characterize major geologic units in terms of major elements, rock forming minerals in which those elements are sited, and isotopes, 
3) characterize morphology and relative stratigraphy of surface units,
4) determine the rates of exchange of key chemical species (S, C, O) between the surface and atmosphere,
5) place constraints on the size and temporal extent of a possible ocean in Venus’s past, 
6) characterize variability in physical parameters of the near surface atmosphere (pressure, temperature, winds), and 
7) measure the ambient magnetic field from low- and near-surface elevations.

Link to Venus Mobile Explorer paper.  My thanks to Lori Glaze, lead author of the paper, for her assistance in writing this summary of the mission analysis.

Tuesday, June 22, 2010

Correction: Venus Tessera Lander

Note: A previous version of this entry had the lander crashing onto the surface at 32 km/second -- that should have been a much gentler 32 km/hour (or 9 m/second * 3600 seconds in an hour / 1000 m in a kilometer).  I apologize for the mistake.

Sunday, June 20, 2010

Venus Tessera Lander Concept

Note: A previous version of this entry had the lander crashing onto the surface at 32 km/second -- that should have been 32 km/hour (or 9 m/second * 3600 seconds in an hour / 1000 m in a kilometer).

The Decadal Survey is exploring 25 mission options (at last report) for possible inclusion in the next decade of planetary missions.  (See the complete list of concepts in this blog entry.)  Each mission is initially scoped out by a team at one of NASA's centers or John Hopkin's Applied Physics Laboratory to understand the technical requirements.  An independent firm then assesses the likely costs of the mission.  The results of two concept studies have recently been published as part of the proceedings of the 7th International Planetary Probe Workshop.  In this entry, I'll describe the Venus Intrepid Tessera lander (VITAL) concept, and in the next entry I'll describe the Venus mobile explorer concept.

In many ways, the proposed tessera lander sounds much like the Venus SAGE lander currently in competition for the next New Frontiers mission slot.  While details probably differ between the two proposed missions, what we learn from the from the VITAL concept probably also applies to the SAGE proposal

Broadly speaking, the Venusian surface is covered by extensive plains (which make up the largest portion), large shield volcanoes, the tessera.  The latter are continent-sized regions of highly deformed, folded terrain.  The origin of the tessera is unknown, although there is speculation that they may represent the oldest terrain on Venus.  Measurement of the composition of the tessera is a high scientific priority.  (By contrast, the SAGE mission would go to recently identified terrain on the flanks of a volcano that may be among the youngest terrain on Venus.)



In the past, it's been assumed that the tessera were off limits to landers because the steep terrain would prevent a safe landing.  For this concept study, it was assumed that the slope might be as high as 30 degrees and that the lander might partially sit on a a large rock, creating further tilt.  To deal with these conditions, the probe's pressure vessle is mounted above a heavy outer ring that lowers the center of gravity to provide stability in case of extreme tilt of up to 72.7 degrees.  The lander uses drag plates to slow its descent through the dense lower atmosphere and hits the surface with a speed of 32 km/hour.  The thermal system is designed to allow the probe to function during the one hour descent and for two hours on the surface.

Example sampling area for the Raman/LIBS instruments and context imaging.

A decade ago, it was assumed that high quality compositional measurements of the Venus surface would require a complicated sampling mechanism that would deliver samples to instruments inside the probe through an airlock.  Today's mission concepts instead rely on lasers to illuminate or melt the surface materials with the results analyzed via spectrometry.  (The Mars Science Laboratory's ChemCam will use this technique at Mars.)  Using lasers and spectrometers greatly simplifies the probe design since only a window is needed to access the surface.  The laser will operate in two modes.  In a low power mode, it will illuminate the surface for analysis by a Raman spectrometer.  At higher power, the surface material is vaporized for laser induced breakdown spectrometry (LIBS) and the resulting plasma is spectrally analyzed.  Analysis is carried out across a 0.86 m row of spots each 0.3 mm approximately two meters from the lander.  A camera will take high resolution context images of the sampling area.

Another key goal of the mission is analysis of the atmospheric composition during the descent and on the surface.  A neutral mass spectrometer and a tunable laser spectrometer will perform these tasks.  Another set of instruments will measure the physical charateristics of the atmosphere such as temperature and pressure during the descent.

Two camera systems will provide context images of the landing site.  The descent camera will take a series of nested panchromatic images as the probe nears the surface.  The panoramic imager will take color and near infrared images of the surface in four directions to image a total of 240 degrees of the horizon.

Comparison to the SAGE proposal: Only limited information on the SAGE mission has been publicly released (see this blog entry for a summary).  At the summary level, the two missions seem very similar.  They would carry nearly identical instrument sets, although the SAGE mission apparently would have an arm that could dig a trench to allow the laser to shoot targets 3-10 cm below the surface.  The SAGE lander would be designed to survive for three hours on the surface.

The two missions are so similar that if the SAGE mission is selected for the next New Frontiers mission, many aspects of its design likely could be reused for a tessera mission.  No cost estimate is given for the VITAL proposal, but it would seem that if the SAGE mission can be flown within the cost cap of the New Frontiers mission (~$650M for the spacecraft and another ~$550M for other costs), then the VITAL mission could in a similar ballpark, and perhaps less if it can reuse substantial portions of the SAGE design.

You can read the VITAL paper at http://www.planetaryprobe.eu/proceedings/IPPW7%2520Proceedings/Papers/Session2/p385.pdf

Wednesday, June 16, 2010

AVIATR Titan Plane Details

Click on image to go to site for full poster plus additional posters.

A previous post looked at the proposed AVIATR Titan plane proposal.  This mission, which is currently contending for the next Discovery mission slot, would use an airplane to study the surface and atmosphere of Titan.  Unlike previously proposed balloon missions that would drift with the winds, this mission would be able to send the plane to survey specific surface targets such as river systems, lakes, and mountains.  The plane would be able to fly faster than Titan rotates, so that it would always remain on the sunlit, Earth-facing side of Titan.

A video of a presentation on the mission from a meeting last January has been posted on the web.  Together with a recently posted meeting abstract, more information on the science of the mission is now available.  Some key facts:

Total plane mass: 125 kg
Science payload mass: 12 kg
Total returned data: ~2Gbytes

Compared to previously proposed balloon missions (both the 2006 $1B Box study and the Titan Saturn System Mission (TSSM) proposal), this mission has some compromises.  The science payload is about half of what the balloons would have carried (see table below).  Some key instruments such as a mass spectrometer to study atmospheric composition and a radar sounder are not included in the AVIATR proposal.  The TSSM balloon mission would have returned far more data, but that was contingent on the presence of a flagship orbiter to relay data.  The data rate of the AVIATR mission appears to be similar to that of the $1B Box study balloon platform, which would have sent data directly to Earth. However, almost twice as much data would be returned by AVIATR because the balloon would spend half its time facing away from Earth when it would have been on the night side of Titan.

Instruments proposed for the AVIATR plane and the TSSM balloon platform

On the other hand, being able to actively manuever gives AVIATR some key advantages over a balloon.  When AVIATR reaches a target location, it can climb high and fly a grid pattern to take context images of the entire area.  Then it can drop down to ~3.5 km to take high resolution images of portions of the area.

To make the most use of the 2GB of data return, AVIATR would send thumbnail images back to Earth.  Scientists would then select the most interesting images for full transmission, and AVIATR would use data compression to make maximum use of the bandwidth.  A similar scheme was used for the Galileo mission, which had to deal with a similarly constrained data rate due to a malfunctioning antenna.

The cost of the AVIATR mission is described as either Discovery class (~$800M) or New Frontiers class (~$1.2B).  (These are fully burdened costs derived from dividing the proposed decadal budget for these programs by the number of expected missions.  The costs include the ~$450M and ~$650M, respectively, allocated to the principal investigator plus launch vehicle and presumably other overhead.)  The $1B Box study estimated the cost a standalone balloon mission at ~$1.4B using what appears to be similar accounting methods but in FY06 dollars.

Editorial Thoughts: I do believe that we should continue the exploration of Titan and Enceladus in the coming decade.  Currently, the flagship mission slot is given to the Jupiter Europa Orbiter over the Titan Saturn System Mission (a decision I agree with, but one the Decadal Survey could overturn).  In my opinion, portions of the TSSM proposed mission should be flown: An Enceladus multi-flyby (and possible orbiter) mission that would also study Titan in a series of flybys, a Titan lake lander a la the proposed TIME mission, and either a Titan balloon or airplane mission.  There are indications that all of these components individually could be in the Discovery to New Frontier mission class.  Ideally, this would be an international effort with more than one space agency contributing the mission elements. I would like to see the balloon or plane carried to Titan by the Enceladus Saturn orbiter that would also act as a data relay and enable substantially more than 2GB of data to be returned.

If a balloon or plane mission were to be flown, I'd prefer the plane mission.  The plane could better study the surface by flying to chosen locations of high interest rather than depending on the fate of wind direction.  To partially make up for the limited atmospheric instruments in the plane mission, the Titan lake lander could perform atmospheric chemistry measurements during its descent.

Sunday, June 13, 2010

The Plutonium-238 Crisis: Write Your Congress Person

In this blog, I normally try to stay away from advocacy in the belief that there are already plenty of blogs that focus on political advocacy.  In this instance, I will break that rule and suggest that if you are an American citizen, that your write your senators and representative to encourage funding for the restart of Plutonium-238.  (If you aren't an American citizen read on anyway, there's some interesting information here.)  This is in a support of a letter writing campaign being initiated by the Division for Planetary Sciences of the American Astronomical Society.  Their site provides a suggested letter and a related site provides background on the Pu-238 problem. Last year, Congress deleted proposed funding for the restart from the budget.  The planetary science community appears to be concerned that the same could happen again this year.

The chart below neatly summarizes the problem.  NASA has depended on Pu-238 to power missions whereever sunlight is irregular (lunar stations), faint (the outer solar system beyond Jupiter), or solar power is impractical (the Viking landers and the Mars Science Laboratory).  Unfortunately, the United States has not produced new Pu-238 supplies for over two decades, and stockpiles are running low.  Russia had been selling its Pu-238 stockpile to the United States, but has cancelled the contract.  Even if the contract is renegotiated (and I've not seen any news on this since last December), NASA would have sufficient Pu-238 for an upcoming Discovery mission, the Jupiter Europa Oribiter, and one other small mission (the chart below lists the Intenational Lunar Network mission, but the Decadal Survey may or may not priortize that mission over other missions).


Without the Russian Pu-238, NASA would have to power the Jupiter Europa Orbiter using a new, yet-to-tested-in-flight ASRG power source that could use roughly one quarter the Pu-238 currently planned for the mission.  NASA, however, is reluctant to bet a $3B+ mission on untried technology.  By my reading of the situation, if NASA were to take the gamble, it would have sufficient Pu-238 for that mission and perhaps an additional Discovery-class mission beyond the two small missions included on the chart.

Without a restart of Pu-238, a future flagship Titan orbiter might not be able to fly (solar panels for that class of mission at Saturn would be enormous, although smaller orbiters could use solar panels).  Long-lived missions to explore the atmosphere and surface of Titan require Pu-238.  The proposed Argo mission to Neptune, Triton, and a Kuiper belt object also would require Pu-238 as would the Titan Mare lander, the Titan AVIATR plane, the Io Volcano Observer, a lander that moves to different locations on a comet's surface, and a Trojan asteroid multiple flyby-orbiter-lander.  Several missions would be enhance by a Pu-238 power supply including a proposed comet coma sample return, a Mars polar lander, Venus balloon platforms, and probably many missions we've yet to hear of.

Editorial Thoughts: I've said in previous blogs that the most important decision facing the Decadal Survey is whether or not to prioritize a Mars sample return mission (which likely would require nearly half of NASA's planetary program).  The second most important decision may be which missions to prioritize in the face of a finite Pu-238 supply -- Congressional funding is not guaranteed.  The next Discovery mission may be powered by an ASRG (I think it will probably be; I think NASA would want to have the technology flight tested).  If the Jupiter Europa Orbiter flies with ASRGS and there's no future production, then there will be sufficient Pu-238 for just a few, maybe one or two, Discovery-class missions.  Which to prioritize would be a key question.  My vote would be for in-situ missions to Titan and perhaps Argo, but many worthy targets deserve consideration.

If you are an American citizen and would like to see a vigorous future planetary program that includes missions that can't be powered by solar panels, please write your congress people.  The link to the site is http://dps.aas.org/public_policy/docs/Pu-issue-letter.