Friday, December 26, 2008

Plutonium supply

There's an 800 pound (around 400 kg :>) gorilla hanging around discussions of future planetary exploration discussions. The supply of plutonium available to power future missions is limited and likely to be exhausted in the next decade.

NASA has long used plutonium 238 as an electrical power source for missions that could not use or depend on solar power. (The power units use the high heat produced by this isotope to generate power -- they are not nuclear reactors. The correct term is radioisotope power system (RPS)) To date, these have included eight outer planet missions, two Mars surface missions (the Viking landers), and six lunar science stations for the Apollo program. In addition, the Mars Pathfinder and MER rovers have used small amounts of plutonium 238 as heat sources to help keep them warm.

For the future, NASA plans to use plutonium to power the Mars Science Laboratory rover, the next outer planets flagship mission, and possibly a Discovery mission and or New Frontiers mission or two. (At one time, the Solar Probe, which would graze the atmosphere of the sun, was to be plutonium powered, but that mission is now planned to be powered by solar panels.) After that set of missions, it appears that the stockpile of plutonium will be gone.


Planned uses of available Pu238. Even if production were restarted at a cost of several hundred million dollars, availability will ramp up slowly, making availability for post 2020 missions an issue. Click on image for more readable version or read the entire presentation here.

Unfortunately, plutonium 238 is no longer being manufactured. NASA currently is purchasing plutonium 238 from Russia to enable the future missions listed above., and its stockpiles are unknown (at least publicly) but the expectation seems to be that supply is limited. Production could be restarted, but at a cost of several hundred million dollars, or the price of a planetary mission.

Advances in solar cell technology could somewhat relieve the pressure to use RPS to enable outer planet missions. It appears that solar cells could be used out to 10 AU, which would enable missions to Jupiter, Saturn, and inner Centaur bodies. However, there are issues. Radiation degrades solar cell performance, making the use of solar cells for Jovian missions challenging if the probe is to study Europa or Io. (The solar powered Juno orbiter uses a "hole" in the radiation belt close in to Jupiter plus a short mission lifetime to avoid this problem.) Even when the radiation can be avoided, large solar cell panels add weight, make instrument pointing difficult, and may require battery backups for eclipses and times when the cells cannot be pointed at the sun. For missions to Saturn or Centaur bodies, the power levels available would be low.

Power available for outer planet missions using solar panels. (Click on image for more readable version or read the entire presentation here.)

Saturn orbiter power concept. After Cassini, would a 370W power supply enable exciting missions at Saturn? For a Titan orbiter, the craft would have to deal with even less since Titan would block the sun for a portion of most orbits. The proposed Titan Saturn Flagship mission would have 540 W of power at end of life (EOL).

In a worst case reading of the situation, the solar system available for exploration could shrink to the inner solar system. Of course, smart people have been working on this issue. The next several posts will deal with ideas to work around the plutonium supply limitations (under the assumption that production doesn't restart).

If you don't want to wait to read more, Emily L. did an excellent write up on the problem and one approach in her blog.

Friday, December 19, 2008

Science on Next Flagship Selection

The subscription only journal Science has a long article on the decision process between the Euopa-Jupiter and Titan-Saturn missions. A few tidbits follow:

"Ronald Greeley of Arizona State University, Tempe, NASA co-chair of the joint science definition team, declared that "the Europa Jupiter System Mission is essentially ready to go. Of course, the key driver is exobiology." And the theme of the proposed joint mission to the Jupiter system is the emergence of possibly habitable worlds."

"The Titan team's pitch is broader. "There's something on Titan for virtually all aspects of planetary science," was how Jonathan Lunine of the University of Arizona, Tucson, NASA co-chair of the Titan Saturn System Mission (TSSM) science team, described it. The mission would investigate how Titan functions as a system, determine how far prebiotic chemistry has developed, and continue exploring Enceladus with a series of flybys."

"By the end of January, they will jointly select one mission to proceed. They [NASA and ESA] are likely to be balancing the technological ambition of the Titan balloon and the 9-year travel time to Saturn against a science focus on Europa. After that, though, both NASA and ESA have years of maneuvering for funds ahead. NASA will need to navigate around the fallout from MSL; ESA will have to compete its outer planets mission against two astrophysics projects, and both must overcome budgetary woes from the financial crisis. As Green said, an outer planets flagship mission "is not a done deal.""

Exploring Jupiter's Moons

Previous entries in this Io exploration series discussed overall mission constraints, science goals, and one proposed mission. It's likely given budget constraints and many interesting solar system targets, that we will get just one mission in the foreseeable future to explore any of Jupter's moons. If the Jupiter-Europa mission is chosen as the next Flagship mission (and it would include both closeup and long distance Io observations), then I would not expect to see either the Io or Ganymede observers chosen as future missions.

Let us suppose, however, that Titan is chosen as the destination for the next Flagship mission. That leaves Jupiter's moons as viable targets for future Discovery and New Frontiers missions.
Based on the ground rules of those missions, we would expect that one moon would be the focus (my vote is Io, but there are Ganymede champions, too). We have become used to extended missions that greatly expand on the goals and science of the original mission. Could one mission do the holy grail and explore multiple moons? In theory, the flybys could be done in an extended mission after the initial mission studying Io was completed.

Gravity assists would certainly enhance the possibility of missions that would visit multiple moons. If the craft plans to explore Io, however, and reduce radiation explore by flying a highly inclined orbit, then there is a catch. As I understand the rules of gravity assits, it would be hard to use Io flybys in an inclined orbit to set up subsequent encounters with the other major moons. (Although the mission design wizards might surprise me.) Instead, the craft might have to carry enough fuel to raise the perijove from Io to Europa or Ganymede. That's not impossible. Galileo raised its perijove by a similar amount after entering Jovian orbit. If the orbit was raised to encounter Ganymede, that moon is large enough that the inclination could be lowered to enable encounters with Callisto or Europa. Such a strategy, however, requires the craft to carry the extra fuel, which means a tradeoff of a larger launcher or less payload. It is doubtful that a proposer would suggest making that tradeoff to enable a possible extended mission that might or might not happen.

Another issue is instruments. The priority instruments for Io differ from those for the icy moons. For Io, for example, a thermal imager to map volcanic activity is a high priority. Its a much lower priority for the icy moons where it would be used to search for any hot spots. (Hot being relative on frigidly cold moons.) For the icy moons, near infrared spectrometers and ice penetrating radars are higher priority instruments. The infrared spectrometer is a mid-priority instrument for Io, and I haven't seen the radar listed as a priority for this world. The tension on instrument payloads extends to the details. Cameras typically carry filters to image in specific spectral wavelengths to image specific materials. This is not my field of expertise, but my understanding is that the filters desired for Io and the icy moons differ.

The Io Volcano Observer shows that a very tightly focused Jovian moon mission could be done on a Discovery budget (~$450M including launcher) if NASA relaxes budget constraints (in the case of IVO by supplying the power system at no cost to the proposer). If I read the slides describing the proposal correctly, the budget is very tight, with it unclear whether the imager, for example, would have all the filters that would optimize observations. Useful instruments such as a wide angle camera for stereo images or a near-infrared spectrometer are not on the proposed list and appear as wishes. If we are looking at a mission that would cover the science observations of multiple bodies, then the Discovery budget feels inadequate. We would probably need the resources of a New Frontiers ($650M not including launcher) to do an adequate job.

Europa has clearly been listed as the highest priority Jovian moon. If the next flagship mission goes to Titan, then a Europa observer that would do multiple flybys would logically be the next priority for a Jovian moon mission. The goals of the Europa mission would likely be similar to those of the proposed Ganymede observer. Much more of the moon could be imaged at high resolution than was possible with Galileo. A modern spectrometer (Galileo’s instrument was mid 1970s technology) could possibly determine whether or not ocean material lies near the surface. An ice penetrating radar could sample small transects of the surface during each flyby to test how thick the crust is.

If a Europa observer were to fly, extending the mission to observe Ganymede and Callisto would be easier than with an Io observer. The radiation field at Europa is less intense than at Io, possibly allowing the Jovian orbit to be in the plane of the moons. If so, then it would be easy to use gravity assists to arrange flybys of Ganymede and Callisto. The instruments tuned to study Europa would also be well suited to studying the icy surfaces of those other two moons.

Discovery and New Frontiers spacecraft are implemented under tight budget constraints. Proposing instruments for a possible extended mission would be a gutsy move in a highly competitive environment. I would love to see a proposed New Frontiers Galilean moon observer, which is what would be needed. I doubt that would happen. Instead, any mission proposals for Galilean moon missions are likely to be tightly focused on a single target. So if Titan is selected as the target of the next Flagship mission, then we would want two follow on missions to study the moons. One would be optimized for Io (and most importantly be placed in an orbit to minimize radiation and increase the number of flybys) and then other for the icy moons.

Tidbits from AGU

I'm flying home (to a major snowstorm) after attending the Fall American Geophysical Union (AGU) conference, which is one of the largest scientific gatherings for planetary science. For the science revelations, please look at Emily's blog at the Planetary Society. Here, I'll report on a number of tidbits related to future planetary missions. In future entries, I'll discuss the Venus Flagship proposal and the VALOR Venus balloon discovery proposal.

As I waited at the airport, I missed the kickoff of the next planetary Decadal Survey. Modeled on the similar surveys done by the astronomical community, these surveys look at the state of the science, options for future missions, and prioritize NASA's exploration efforts for approximately the next decade. (In a future blog entry, I'll provide a report card on the last Decadal Survey completed in in 2003.) A key goal of this survey, I'm told, is that it will make a strong effort to get much more accurate estimate of costs for its key recommendations. In the last astronomical survey, for example, the cost of the James Webb Space Telescope was severely underestimated. As a result, a number of missions of lower priority have had to be deferred to cover the cost overrun. A similar example in the planetary program might be the Mars Science Lab (MSL), but as explained in a previous entry, the Decadal Survey was recommending a modest technology development mission while the Mars community was recommending a major science mission. (The difference between the two at the time was around $1B.) I am told that the goal is to complete the next Decadal Survey in approximately six months.

I had a long chat with one of the Titan-Saturn Flagship proposal engineers. He explained the major reason that the proposed mission will image Titan at 50 m compared to the state of the art cameras at Mars that image that planet at sub meter resolutions. The Titan atmosphere extends so far into space that the orbiter has to orbit 1500 km above th surface. Compare that to the 250 distance of the Mars Reconnaissance Orbiter. I suspect that additional issues – such as imaging at longer wavelengths (which reduces resolution) and the ubiquitous haze – are contributing issues. (It’s also important to remember that the instruments listed in the proposal are placeholders. The actual instruments to be flown would be selected through a competition. Generally the selected instruments are more capable than the placeholders.)

The mission designer also explained why the orbiter delivers the balloon and lander into the Titan atmosphere months before Titan orbit insertion. This isn't an issue with the lander which will have a surface lifetime of hours. It does create relay issues (but not insurmountable ones) for the balloon. Apparently the weight of the two in situ craft is enough that the mission designers do not want to use to extra fuel that would be caused by carrying them longer.

He also explained why the option of simply launching the balloon and lander separately to arrive after the orbiter is in place at Titan isn't the plan of record. It is cheaper to have a single launch. More importantly, the balloon has its own plutonium power source. ESA's rules apparently prevent it from launching craft with radioactive power sources. NASA doesn't want the cost of a second launch on its books. In theory, ESA could contribute hardware to the orbiter equivalent to NASA's cost of a second launch. However, the ground rules of the proposal stated that NASA would pay for the orbiter and ESA the in situ probes. If Titan is selected as the destination of the Flagship mission, this rule can be re-examined.

And speaking of re-examining the redefinition of the Titan mission, Thomas Spilker dropped some hints. Spilker is one of the mission design wizards at JPL who examines options for future missions. (He's published papers, for example, on options for Neptune orbiters even though those are decades away.) He gave an overview of the challenges of designing a mission that includes both Enceladus and Titan as options. He didn't say too much that wasn't already in the mission proposal. He did say that the current mission configuration is subject to significant change should it be chosen.

I talked with another mission designer who thinks there may be options to first orbit Titan and then move to orbit Enceladus using relatively little fuel. He hasn't published his work, so I won't say more.

I stopped by the NASA booth at the conference. After trying to figure out how to “borrow” the detailed models of the Cassini and Phoenix spacecraft, I talked with the gentlemen at the radioisotope power table. This is the group that provides the radioisotope thermal generators (RTGs) for outer planet missions (including the MMRTG that will power the Mars Science Lab and the ASRG that reduces the use of plutonium dramatically). Right now, the generators are pretty big and sized to deliver hundreds of watts. They were polling attendees for mission ideas for power sources in the 10 to 50 watt range. Right now, mission designers have a choice of batteries, solar power, or large RTGs. If you want to do a mission with small probes where the probe has to operate for longer than batteries will suffice and solar power is difficult to impossible, then you are out of luck. If these small plutonium power generators were developed, they likely could enable a range of missions, such as network stations on Mars or Titan, long lived comet landers, long lived Venus balloons, small balloons carrying only cameras for Titan (think of four balloons instead of one imaging the surface), etc. These are only my ideas – the scientific community would come up with far more and more clever uses.

I'll write a separate blog entry or more likely a series to discuss the Venus Flagship proposal. One of the goals would be to fly a synthetic aperture radar that could image the surface at less than 10 m (6 m was mentioned). Only a portion of the planet could be imaged. However, I once read that each doubling of resolution increased the scientific content of an image by 10X. If I remember correctly, Magellan mapped Venus at a resolution of a hundred to hundreds of meters. This mission would do for our understanding of Venus what the high resolution cameras of the last decade did for our understanding of Mars. And those cameras imaged only a few percent at highest resolution.

Tuesday, December 16, 2008

Io Missions - Part 3: Io Volcano Observer


Previous posts discussed general goals and constraints on a mission to Io and the science goals for such a mission. This entry discusses a specific mission concept, the Io Volcano Observer (IVO). Also see Jason Perry's write up on IVO.

NASA is facing a shortage of plutonium to use as a power source for future missions to the outer solar system (and other destinations with limited sunlight). A new design called the Advanced Stirling Radioisotope Generator (ASRG) would dramatically reduce the amount of plutonium required for future missions. The techology is new, however, and NASA may want to fly it first on an inexpensive Discovery-class ($450M) mission instead of on a more expensive New Frontiers ($650M) or Flagship (~$3B) mission.

Approximately a year ago, NASA began funding several studies of Discovery class missions that would provide a first use of ASRG's. One of those studies, led by Alfred McEwen of the University of Arizona, is for a Io Volcano Observer (IVO). Dr. McEwen was kind enough to provide me a copy of a presentation on the mission concept that he presented to the Berkeley Io Workshop on December 12. (The images come from his presentation.)

IVO would orbiter Jupiter in a highly inclined (>45 degrees) orbit with periapsis at Io's orbit. This orbit minimizes the craft's exposure to the intense radiation fields of Jupiter. On the other hand, it keeps the craft well away from Jupiter's other large moons. While significant obserations of Jupiter itself would be made, the focus of the mission is squarely on Io. Fans of other Jovian moons would be left waiting for other missions. (However, it is possible that IVO might be able to image some of the small moons that orbit inside Io's orbit. In addition, some long term observations of Europas extended atmosphere might also be possible.)


Red orbits are IVO's; white orbits are the major Galilean moons. IVO will not come close enough to Europa, Ganymede, or Callisto for detailed imaging, although studies of Europa's tenuous atmosphere may be possible.


McEwen points out that even if the Jupiter-Europa Orbiter (JEO) is selected as the next Flagship mission that IVO would still provide important complimentary science. JEO would provide 4 science flybys of Io before moving to targets further out in the Jovian system. IVO, however, would provide "unique polar viewing and in-situ sampling geometry of Io, torus, etc; spectral bandpasses designed for Io science, orbit designed to answer key Io questions, and the more flybys the better as Io always changes." IVO would also reach Io a number of years before JEO.

Most of the rest of this blog entry focuses on the nuts and bolts of the proposal, but I'll add my thoughts here. I am extremely impressed with the capabilities of this proposed mission, especially given the target budget of $450M (which it isn't quite hitting yet but is within striking distance). However, coming within striking distance may be enabled by the assumption (provided as a baseline for the concept study) that NASA would provide the ASRG's outside of the mission budget cap. Put another way, if the mission had to pay for its own power source (ASRG or solar cell), it might not be able to fit within a Discovery mission budget. NASA has yet to decide if it will do so for the next Discovery competition. I hope that McEwen or others will also propose a similar mission (using solar cells) for the New Frontiers competition in progress. The New Frontiers program would appear to have sufficient budget to fly the mission and include some additional instruments beyond the baseline planned for IVO.

[A note on mission classes: The price caps for each Discovery and New Frontiers mission are set with each selection competition. For Discovery missions, a working figure for mission costs is $350-450M for the spacecraft, instruments, and launch vehicle (plus other costs). For the next New Frontiers mission, the cap is $650M not including the launch vehicle. While exact comparisons are difficult, as a rule of thumb, Discovery missions appear to spend approximately half as much on spacecraft and instruments as New Frontiers missions.]

McEwen's e-mails to me suggest that he will not propose the mission as a New Frontiers candidate because the high data bandwidth needed to study the Io requires the power levels of the ASRG's. He also says that there are other issues with solar power. He didn't elaborate, but radiation damage to the solar cells and the difficulty of point the instruments at Io while keeping large solar panels toward the sun may be among them.

I would very much like to see a mission like this fly, whether within the Dicovery or New Frontiers program. (Although if Europa/Jupiter is picked as the next target for a Flagship mission, it would perform much of the science proposed for this mission.)

Here's a summary of key facts about the proposed mission:

"Primary science objectives:

1. Understand active volcanic processes on Io
2. Understand tidal heating of Io
3. Understand the loss of matrial from Io and effects on the magnetosphere, plasma torus and neutral clouds"

Launch in January 2015 on a Venus-Earth-Earth gravity assist trajectory with arrival at Jupiter in 2021.

Baseline mission has an Io flyby at orbit insertion, and six additional flybys over approximately a year and a half. Additional flybys in an extended mission are possible (>4 mentioned in the presentation).

Flyby distances range from 100-1000 km.

It appears that approximately 20Gbits of data would be sent to Earth per month. (Compare this with 0.2Gbits of data returned by the Galileo mission for Io.) Early in the mission, when orbit periods are longer, it appears that this data would be a mixture of Io and Jupiter observations. Later in the missions when the orbits are approximaly one month long, Io observations would dominate the available bandwidth.

Mission ends with impact on Io for planetary protection. (Keeps the spacecraft from accidently delivering Earth organisms to Europa.)

Total costs are currently conservatively estimated at $471M (including launch vehicle) versus a cap for the exercise of $450M. (No indication of how risky the mission implementation is within this budget compared to other Discovery program mission proposals.)

The baseline instrument complement focuses on the essential science (and weighs just 32 kg):

Narrow angle radiation-hardened camera with both a black and white framing mode and filters for pushbroom imaging in multiple colors that can provide 1 km/pixel resolution at 100,000 km or 10 m/pixel at 1,000 km. Science goals: monitor eruptions, measure peak lava temperatures, limited topography, Io surface composition (if budget allows for sufficient spectral filters), observe Jupiter's cloud deck (Tech specs: 10 urad/pixel compared to 5 urad/pixel for the New Horizon's LORRI camera; 2000 x 2000 pixel array with up to 1000 lines dedicated to multispectral imaging in pusbroom mode; spectral range ~200-1000 nm; up to 15 spectral filters; ~15 kg)

Thermal mapper to "map and monitor temperatures, heat flow pattern related to internal structure and tidal heating mechanisms." If budgets permit, the instrument could be enhanced to study Io surface composition using thermal emission spectroscopy and map Jovian hot spots. (Tech specs for this instrument appear to stil be in definition. Possibilities listed in the presentation are 640x480 detectors; ~2-20 microns; 1 km/pixel from 8,000 km; up to 10 bandpasses; ~12 kg).

Ion and neutral mass spectrometer to study spatial distribution of neutrals contributing to Io plasma torus , gas composition of Io plumes, composition of Io's (very thin!) atmosphere. (Tech specs: 1-300 amu; measurements every 5 seconds; 4 kg).

Magnetometer to study Jupiter's magnetosphere and "place tighter constraints on Io's internally generated magnetosphere (hard)" (Tech specs: 2 at 1 kg each)

This payload focuses on the essential Io science. Additional desired instruments in apparent order of priority are: more spectral bandpasses on camera and thermal imager; second, medium gain antenna to enhance gravity science; second neutral mass spectrometer with a different view; wide angle camera for better Io imaging close up, especially stereo imaging of topography; near-infrared spectrometer for minerology studies [my note: would also be useful for Jupiter observations]; UV spectrometer (s) for torus studies and Io atmosphere/plume composition.; energetic partical detector for "science and future exploration."